刘蕴,刘新建,李红,等.福岛核事故137Cs释放源项反演研究[J].中华放射医学与防护杂志,2019,39(4):290-296.Liu Yun,Liu Xinjian,Li Hong,et al.Estimation of 137Cs source term from Fukushima nuclear accident[J].Chin J Radiol Med Prot,2019,39(4):290-296 |
福岛核事故137Cs释放源项反演研究 |
Estimation of 137Cs source term from Fukushima nuclear accident |
投稿时间:2019-02-18 |
DOI:10.3760/cma.j.issn.0254-5098.2019.04.011 |
中文关键词: 福岛核事故 核事故源项 反演 变分数据同化 截断最小二乘 |
英文关键词:Fukushima nuclear accident Inverse modeling Source term for nuclear accidents Variational data assimilation Truncated total least squares |
基金项目: |
|
摘要点击次数: 3441 |
全文下载次数: 1627 |
中文摘要: |
目的 研究并反演福岛核事故137Cs释放源项,为事故评价与辐射防护提供依据。方法 采用截断总体最小二乘变分核事故源项反演模型(TTLS-VAR),平衡利用环境监测数据,修正扩散模型算子与监测向量以降低大气扩散模型误差的影响,反演计算137Cs释放源项,提高源项反演的准确性。结果 反演计算的福岛核事故137Cs释放总量为1.74×1016~3.73×1016 Bq,释放的最高峰出现在2011年3月18日,释放率超过1.00×1012 Bq/s。比较表明,137Cs释放总量与国际原子能机构(IAEA)和联合国原子辐射效应科学委员会(UNSCEAR)公布结果相接近,释放序列与日本的事故源项与进程分析具有较好的一致性,释放率最高峰值对应福岛3号机组的泄漏事件。结论 采用TTLS-VAR事故源项反演模型,计算福岛核事故137Cs释放源项,为事故评价与辐射防护提供依据。 |
英文摘要: |
Objective To study the 137Cs source term from the Fukushima Daiichi nuclear power plant, based on inverse modeling, so as to provide reference for accident assessment and radiation protection. Methods The 137Cs source term was estimated by means of inverse modeling of nuclear accidents based on variational data assimilation combined with truncated total least squares (TTLS-VAR). The environmental monitoring data was balanced, and the dispersion model operator and monitoring data vector were corrected, in order to reduce the influence from atmospheric dispersion model error, and then improve the accuracy of inverse modeling of source term. Results The total amount of 137Cs released was estimated to be 1.74×1016-3.73×1016 Bq, with the highest peak of release rates estimated appearing on March 18, 2011 and the average release rate in exceed of 1.00×1012 Bq/s. The estimated total amount of 137Cs was close to the data published by IAEA and UNSCEAR. Also, the estimated release sequences were in good consistent with Japanese analytical results of source terms and sequence of events. The highest peak of the estimated release rate curve corresponds to the leakage incident of unit 3. Conclusions In this study, the 137Cs source term from the Fukushima Daiichi nuclear power plant is estimated by using TTLS-VAR inverse modeling, which could provide the basis for accident assessment and radiation protection. |
HTML 查看全文 查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|